AI infrastructure growth acceleration
Global data center electricity demand is projected to exceed 1,700 TWh by 2035 in the Lift-Off Case — reaching 4.4% of global electricity demand.Read source
Global AI data center power demand could reach 68 GW by 2027 and 327 GW by 2030, compared with total global data center capacity of just 88 GW in 2022.Read source
Global power demand from data centers will increase 50% by 2027 and by as much as 165% by the end of the decade.Read source
The AI-driven data center expansion represents the largest compute infrastructure buildout in history.Read source
Inconsistent capacity modeling & metrics
Projections for 2030 range from just over 200 TWh to nearly 8,000 TWh — a factor of almost 40.Read source
Fragmented demand signals & planning uncertainty
Utilities are being flooded with "speculative" interconnection requests — duplicate filings and "phantom" load that will never be built.Read source
Tech companies are shopping the same big projects around to multiple utilities as they look for quickest access to power.Read source
Five to ten times more interconnection requests exist than data centers actually being built.Read source
The need for standardization & transparency
Introducing a standardized and transparent load-side interconnection process is essential to control speculation.Read source
Rapid expansion of AI infrastructure requires new frameworks for coordination built on shared definitions and transparent methodologies.Read source
These sources establish Clarke's market context: unprecedented AI infrastructure scaling, capacity models diverging by factors of 40×, speculative demand distorting utility planning, and explicit calls for standardized definitions and transparent methodologies — the foundational challenges Clarke addresses.